English Maltese
Public Service Logo divider Site Logo
  • About us
    Our Vision What we do FOI FAQS
  • OPS
    ORGANISATION STRUCTURE ERDF.04.168
  • REMOTE WORKSPACES
  • Contact Us
  • image
    QUALITY OF SERVICE DIRECTORATE
    QUALITY OF SERVICE RATE THE PUBLIC SERVICE Organization Structure
    PEOPLE RESOURCING & COMPLIANCE DIRECTORATE
    PEOPLE RESOURCING AND COMPLIANCE Manuals FORMS AND TEMPLATES ORGANISATION STRUCTURE
    PEOPLE RELATIONS DIRECTORATE
    People Relations CONDITIONS OF SERVICE DISCIPLINE One-Stop-Shop POLICIES AND GUIDELINES REPORTS LEAVE BANK PSMC Previous Versions PSMC e-Forms ORGANISATION STRUCTURE
    People Strategy and Projects
    People Strategy and Projects ORGANISATION STRUCTURE
    Personnel Systems and Compliance Directorate
    Personnel Systems and Compliance PERFORMANCE APPRAISAL ORGANISATION STRUCTURE
    INDUSTRIAL RELATIONS UNIT
    INDUSTRIAL RELATIONS UNIT ORGANISATION STRUCTURE
    INSTITUTE FOR THE PUBLIC SERVICES
    INSTITUTE FOR THE PUBLIC SERVICES ORGANISATION STRUCTURE
  • About us
    Our Vision What we do FOI FAQS
  • OPS
    ORGANISATION STRUCTURE ERDF.04.168
  • REMOTE WORKSPACES
  • Contact Us

  • QUALITY OF SERVICE DIRECTORATE
    QUALITY OF SERVICE RATE THE PUBLIC SERVICE Organization Structure
  • PEOPLE RESOURCING & COMPLIANCE DIRECTORATE
    PEOPLE RESOURCING AND COMPLIANCE Manuals FORMS AND TEMPLATES ORGANISATION STRUCTURE
  • PEOPLE RELATIONS DIRECTORATE
    People Relations CONDITIONS OF SERVICE DISCIPLINE One-Stop-Shop POLICIES AND GUIDELINES REPORTS LEAVE BANK PSMC Previous Versions PSMC e-Forms ORGANISATION STRUCTURE
  • People Strategy and Projects
    People Strategy and Projects ORGANISATION STRUCTURE
  • Personnel Systems and Compliance Directorate
    Personnel Systems and Compliance PERFORMANCE APPRAISAL ORGANISATION STRUCTURE
  • INDUSTRIAL RELATIONS UNIT
    INDUSTRIAL RELATIONS UNIT ORGANISATION STRUCTURE
  • INSTITUTE FOR THE PUBLIC SERVICES
    INSTITUTE FOR THE PUBLIC SERVICES ORGANISATION STRUCTURE

ERDF.04.168: IMPROVING ENERGY EFFICIENCY WITHIN THE PEOPLE & STANDARDS DIVISION - OPM PREMISES

This project which is partly financed by European funds under the Operational Programme I, Cohesion Policy 2014-2020 "Fostering a Competitive and Sustainable Economy". The aim of this Project was to increase carbon neutrality by promoting energy efficiency in public infrastructure and minimise the release of Carbon Dioxide (CO2) in the atmosphere. This Project was completed, simultaneously with the addition of the 4th floor at Castille Place, Valletta to host the Employee Support Program Unit.

With the completion of this project, the Castille Place building is using less energy from fossil fuels with the installation of the double-glazed apertures, roof insulation and the installation of LED lighting to the new build floor. Hence, less energy is required to reach thermal comfort. Therefore, the project is reducing dependency on fossil fuels which indirectly will provide.

Image
Image
Government Logo
  • About us
  • OFFICE OF THE PERMANENT SECRETARY
  • QUALITY OF SERVICE DIRECTORATE
  • PEOPLE RESOURCING & COMPLIANCE DIRECTORATE
  • PEOPLE RELATIONS DIRECTORATE
  • PEOPLE STRATEGY AND PROJECTS
  • PERSONNEL SYSTEMS AND COMPLIANCE DIRECTORATE
  • INDUSTRIAL RELATIONS UNIT
  • Contact Us
Website Footer Icon
Footer Site Logo
  • Terms Of Use
  • Privacy Policy
  • Cookie Policy
  • Accessibility Statement
This site uses cookies to guarantee you the best experience. If you do not change your settings, we understand that you are accepting the use of cookies automatically. MoreInformation